三年片免费观看大全第四集,东宫禁脔(H 调教),国产精品久久久久久久久动漫,成全电影大全在线观看国语高清

Contact us
Send E-MAIL
Home ? Support ? Case Studies ? Smart Meters

Smart Meters

2016-09-02 09:41:50

 
Smart power meters require data-logging for energy management and billing., plus enhanced reliability for long-life in harsh environments.  In addition, data retention over long periods of time is needed so that utility companies can monitor usage patterns or take advantage of time-of-use rate structures. 
Smart Meter manufacturers are beginning to adopt MRAM for on-site data retention.  This is true because twenty year data retention over the entire operating temperature range means MRAM memory can be relied upon for critical data storage, without back up by battery.  Should power fail, data is not lost and the memory will fully recover when power is restored. 
Utility companies can provide a dynamic security feature in which security keys and codes are updated or erased remotely. Detection of tampering using high-strength magnetic fields is possible with MRAM.
Radio and Microelectronics (RIM) has recently selected an Everspin 4Mb Serial SPI MRAM for use in their RIM789 Smart Meter. RIM 3-phase smart meters are GOST 52320-2005 certified in Russia, specified to deploy for 30 years in harsh environments, and feature self-diagnosis and resistance to climatic, mechanical and electromagnetic influences.
 
 
If you want to know anything about everspin products, please contact Ramsun International Limited

Open

      <menu id="qnkkk"></menu>
      <center id="qnkkk"></center>

      <pre id="qnkkk"><li id="qnkkk"><code id="qnkkk"></code></li></pre>
        <track id="qnkkk"><label id="qnkkk"><label id="qnkkk"></label></label></track>
        1. 主站蜘蛛池模板: 古浪县| 无极县| 墨江| 崇文区| 沙坪坝区| 竹山县| 宜良县| 禄丰县| 富顺县| 河北省| 哈密市| 大姚县| 长沙市| 会理县| 故城县| 五河县| 巴东县| 自贡市| 安龙县| 广汉市| 郴州市| 莱芜市| 绥棱县| 松桃| 巴中市| 恩施市| 宝山区| 克山县| 黄大仙区| 毕节市| 绥棱县| 遵义市| 维西| 凤台县| 呈贡县| 伊宁县| 万全县| 肥城市| 柘城县| 高邮市| 安平县|